Process for producing jet fuel from a hydrocarbon synthesis product stream

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9879192
SERIAL NO

14254783

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for producing jet fuel comprising the following steps:

    A.1) separating at least a portion of the C9 to C15 fraction from the product of a hydrocarbon synthesis process;A.2) converting at least a part of the separated C9 to C15 fraction to aromatic hydrocarbons;A.3) obtaining a jet fuel comprising the, optionally further treated, converted separated C9 to C15 fraction of step A.2);B.1) separating at least a portion of the C16+ fraction from the product of a hydrocarbon synthesis process;B.2) reducing the average number of carbon atoms of at least a portion of the separated C16+ fraction;B.3) optionally, separating the C9 to C15 fraction of at least a portion from the product obtained from step B.2); andB.4) adding at least a portion of the C9 to C15 fraction separated in step B.3), if present; orat least a portion of the product of step B.2).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SASOL TECHNOLOGY (PTY) LTDJOHANNESBURG SOUTH AFRICA
AXENSFRANCE RUEZ - MA MAISON RUEIL-MALMAISON HAUTS-DE-SEINE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fedou, Stéphane Paris, FR 2 12
Gagniere, Marielle Bougival, FR 3 4
Watermeyer, De Wet Ewald Vanderbijlpark, ZA 1 3
Williams, Pata Clair Vanderbijlpark, ZA 1 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00