Method of manufacturing a temperature-compensated micro-electromechanical device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9878903
SERIAL NO

14271009

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods of forming micro-electromechanical device include a semiconductor substrate, in which a first microstructure and a second microstructure of reference are integrated. The first microstructure and the second microstructure are arranged in the substrate so as to undergo equal strains as a result of thermal expansions of the substrate. Furthermore, the first microstructure is provided with movable parts and fixed parts with respect to the substrate, while the second microstructure has a shape that is substantially symmetrical to the first microstructure but is fixed with respect to the substrate. By subtracting the changes in electrical characteristics of the second microstructure from those of the first, variations in electrical characteristics of the first microstructure caused by changes in thermal expansion or contraction can be compensated for.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
STMICROELECTRONICS S R LITALY BRIANZA MONZA MONZA AND BRIANZA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lasalandra, Ernesto S. Donato Milanese, IT 37 854
Merassi, Angelo Vigevano, IT 14 300
Zerbini, Sarah Cornaredo, IT 46 1137

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00