Packaging system for fluidic ejection cartridge with controlled protective tape removal
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Jan 30, 2018
Issued Date -
N/A
app pub date -
Oct 13, 2016
filing date -
Oct 13, 2016
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
A film sealed ejection cartridge assembly is disclosed. The cartridge assembly includes a cartridge for fluidic ejection, as well as a cartridge retainer having a plurality of retainer walls and a retainer opening. The cartridge retainer receives and secures the cartridge. The cartridge assembly further includes a length of a nozzle plate seal film. A first portion of the nozzle plate seal film is removably secured to the fluidic ejection chip and a second portion of the nozzle plate seal film is secured to the cartridge retainer. Removal of the cartridge from the cartridge retainer causes the nozzle plate seal film to separate from the fluidic ejection chip.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
FUNAI ELECTRIC CO LTD | DAITO OSAKA 574-0013 |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Komplin, Steven | Lexington, US | 5 | 42 |
# of filed Patents : 5 Total Citations : 42 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 8 Citation Count
- B41J Class
- 28.29 % this patent is cited more than
- 7 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Jul 30, 2025 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Jul 30, 2029 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events

Matter Detail

Renewals Detail
