Socket holding frame

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9878441
SERIAL NO

15345575

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A socket holding frame has a track base, a positioning board, and at least one positioning mount. The track base has a bottom panel and two rails. Each rail has a sliding channel. The positioning board is disposed on the track base and has two multiple first engaging segments. The multiple first engaging segments are formed on the top surface of the positioning board at spaced intervals, and are aligned in a straight line. Each first engaging segment has a curved engaging groove and an engaging protrusion formed in the curved engaging groove. The at least one positioning mount is slidably and rotatably mounted on the track base. Each positioning mount has multiple second engaging segments, and part of the multiple second engaging segments are selectively engaged with one of the multiple first engaging segments.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KAO JUI-CHIENNO 358 TUNGHSING RD TALI DIST TAICHUNG CITY TAIWAN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kao, Jui-Chien Taichung, TW 105 1885

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00