Method for producing a receptacle for a sensor element

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9877396
SERIAL NO

14151907

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a receptacle for a sensor element, such as a combustion chamber pressure sensor, includes introducing a first amount of a pre-ceramic substance into an injection mold, forming a base layer of the receptacle by molding the pre-ceramic substance in the mold, and applying at least one conductor track to the base layer. A further amount of a pre-ceramic substance is introduced into the mold onto at least a partial region of the conductor track. A top region of the receptacle is formed directly on the base layer while at least partially covering over the conductor track by molding the further pre-ceramic substance in the injection mold. The method also includes debinding and sintering the molded body. The method forms a receptacle for a sensor element that has conductor tracks lying on the inside and incorporated in a gas-tight manner in a ceramic body.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROBERT BOSCH GMBHSTUTTGART GERMANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Heeren, Imke Stuttgart, DE 7 4
Loibl, Thomas Oberstdorf, DE 5 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00