Multilayer substrate and method for manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9877390
SERIAL NO

15141080

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multilayer substrate including a multilayer body formed by laminating a plurality of insulating layers including via holes in the insulating layer as an uppermost layer of the multilayer body so as to pass through the insulating layer, and via conductors formed by filling the via holes with a conductive paste. The via holes are formed through lower end positions, upper end positions, and intermediate positions between the lower end positions and the upper end positions such that a diameter enlargement degree toward the upper end positions from the intermediate positions is larger than a diameter enlargement degree toward the intermediate positions from the lower end positions. By forming the via holes as described above, when the via holes are filled with the conductive paste from openings at the small diameter side of the via holes, exudation of the conductive paste from openings at the large diameter side is prevented.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MURATA MANUFACTURING CO LTDKYOTO JAPAN KYOTO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukuda, Yutaka Kyoto, JP 98 1227
Isebo, Kazuhiro Kyoto, JP 7 39
Oikawa, Yoshikazu Kyoto, JP 2 22
Takemura, Kazuhiko Kyoto, JP 28 501

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00