Methods and nodes for controlling uplink power in a radio network

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9877287
APP PUB NO 20170195971A1
SERIAL NO

15464732

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and network node for controlling power of uplink transmissions from a user node when switching between a first operating mode and a second operating mode. The network node signals to the user node a first value of a maximum allowed transmit power to be applied when operating in the first operating mode and a second value of the maximum allowed transmit power to be applied when operating in the second operating mode. The user node then uses a transmit power not exceeding the first value when transmitting radio signals in the first operating mode, and uses a transmit power not exceeding the second value when transmitting radio signals in the second operating mode. The user node itself thereby regulates the transmit power depending on opera mode without requiring further signalling from the network node.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TELEFONAKTIEBOLAGET LM ERICSSON (PUBL)STOCKHOLM SWE STOCKHOLM

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bergljung, Christian Lund, SE 82 841
Wallén, Anders Ystad, SE 95 1695

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00