Overload control method, and device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9877228
SERIAL NO

14939860

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention discloses an overload control method, a gateway device, a mobility management entity, and a PGW. The method includes: determining, by a gateway device, first overload indication information, where the first overload indication information is used to indicate an overload control policy; and sending, by the gateway device, the first overload indication information to a mobility management entity, so that the mobility management entity executes the overload control policy according to the first overload indication information. According to the overload control method, the gateway device, the mobility management entity, and the PGW in embodiments of the present invention, adverse impact brought by device overload can be avoided; therefore, the device overload can be effectively controlled.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HUAWEI TECHNOLOGIES CO LTD518129 \U3001 BANTIAN HUAWEI HEADQUARTERS OFFICE BUILDING LONGGANG DISTRICT GUANGDONG SHENZHEN SHENZHEN CITY GUANGDONG PROVINCE 518129

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lu, Wei Shanghai, CN 656 6848
Zhu, Fenqin Shanghai, CN 129 534

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00