Data multi-stream transmission method and device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9876722
SERIAL NO

14762915

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A data multi-stream transmission method and device are provided. The method includes that: a sending terminal determines an offloading way of offloading the Protocol Data Unit (PDU) data in a Packet Data Convergence Protocol (PDCP) layer according to an offloading strategy; the sending terminal offloads all or part of the PDU data as offloading data from a first connection to a second connection in the offloading way, wherein the first connection and the second connection are both connections between the sending terminal and a receiving terminal; the sending terminal implements a data multi-stream processing on the offloading data in the PDCP layer, forwards the processed offloading data to a low-level layer for processing, sends the other PDU data except for the offloading data to the receiving terminal through the first connection and the processed offloading data to the receiving terminal through the second connection.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
XI'AN ZHONGXING NEW SOFTWARE CO LTDNO 1 DONGXI SIHAO ROAD COMMUNICATION INDUSTRIAL PARK HI-TECH DISTRICT XI'AN SHAANXI 710114

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
He, Feng Shenzhen, CN 194 1424

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00