System and method for downlink processing in communication systems

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9876657
SERIAL NO

15451209

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An integrated circuit (IC) includes a downlink unit including an input to receive a first plurality of frequency domain (FD) symbols associated with data symbols for a plurality of users, and an iteration unit to perform a plurality of iterations based on adjustment values. Each iteration includes generating a second plurality of FD symbols by performing a precoding process based on the first plurality of FD symbols, generating a third plurality of time domain (TD) symbols by performing a first modulation process based on the second plurality of FD symbols, generating a fourth plurality of TD symbols by performing a dynamic range reduction process based on absolute values of the third plurality of TD symbols, and updating the adjustment values. The downlink unit further includes a decision unit configured to generate transmit TD symbols for transmission through a channel to the plurality of users.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
XILINX INC2100 LOGIC DRIVE SAN JOSE CA 95124

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dick, Christopher H San Jose, US 84 1019
Jeon, Charles Ithaca, US 1 3
Studer, Christoph E Ithaca, US 9 184
Wu, Michael Palo Alto, US 131 3338

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00