Phase shift and attenuation circuits for use with multiple-path amplifiers

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9876475
SERIAL NO

15344304

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments of circuits for use with an amplifier that includes multiple amplifier paths include a first circuit and a second circuit in parallel with the first circuit. The first circuit includes a first input coupled to a first power divider output, a first output coupled to a first amplifier path of the multiple amplifier paths, and a first adjustable phase shifter and a first attenuator series coupled between the first input and the first output. The second circuit includes a second input coupled to a second power divider output, a second output coupled to a second amplifier path of the multiple amplifier paths, and a second adjustable phase shifter coupled between the second input and the second output.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NXP USA INC6501 WILLIAM CANNON DRIVE WEST AUSTIN TX 78735

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ahmed, Abdulrhman M S Gilbert, US 25 191
Bokatius, Mario M Chandler, US 15 191
Hart, Paul R Phoenix, US 68 879
Staudinger, Joseph Gilbert, US 87 1304
Sweeney, Richard E Chandler, US 11 234

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00