Current-resonance type switching power supply apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9876436
SERIAL NO

15394908

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A switching power supply apparatus of a current-resonance type, including a first switching element and a second switching element connected in series, a series circuit of a resonant reactor and a resonant capacitor connected in parallel to the first switching element or the second switching element, a control circuit configured to alternately turn on and off the first switching element and the second switching element, and a load detection circuit. The load detection circuit includes a shunt circuit which shunts a resonant current flowing through the resonant reactor and resonant capacitor connected in series to obtain a shunted current, converts the shunted current to a first voltage signal, and outputs the first voltage signal, a switching circuit which switches between the first voltage signal and a second voltage signal of a ground level to generate a third voltage signal, and an averaging circuit which averages the third voltage signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FUJI ELECTRIC CO LTDKAWASAKI COUNTY OF KANAGAWA CITY JAPAN KAWASAKI-SHI KANAGAWA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Jian Matsumoto, JP 1588 23569

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00