Contactless power supply controller and contactless power supply system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9876365
SERIAL NO

14766676

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A contactless power supply system for transferring power without contact between a primary side coil and a secondary side coil is provided. In the contactless power supply system, a manipulation unit manipulates a secondary side converter so that power outputted to a load is controlled to be a command value. The manipulation unit manipulates an input voltage of a primary side resonance circuit so that a current flowing in the primary side resonance circuit equals a product of a current flowing in the secondary side resonance circuit and a current coefficient. The current coefficient is defined as a square root of a specific value and the specific value is an equivalent resistance of the secondary side resonance circuit divided by an equivalent resistance of the primary side resonance circuit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DENSO CORPORATION1-1 SHOWA-CHO KARIYA-CITY AICHI-PREF 448-8661

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mazaki, Kouji Kariya, JP 7 41
Obayashi, Kazuyoshi Chita-gun, JP 78 1871
Takahashi, Eisuke Nagoya, JP 46 100
Tani, Keisuke Anjo, JP 33 741
Yamaguchi, Nobuhisa Nagoya, JP 49 164

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00