Method for a tension proof closure of the end of an energy cable

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9876291
SERIAL NO

14630794

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for the tension proof closing of the end of an energy cable in which an energy cable is used whose center axis containing the electrical transmission elements is surrounded by a tension proof reinforcement of metal wires. Initially, the reinforcement at the end of the energy cable is removed over a predetermined length. Subsequently, a pipe piece of metal, which tightly surrounds the end of the remaining reinforcement, is placed onto the end of the remaining reinforcement. Finally, a cup shaped tubular elongated sleeve of metal is pushed onto the end of the energy cable and is connected in a tension proof manner to the pipe piece which has, at its free end facing away from the pipe piece, a device suitable for mounting a tension element. In addition, a device manufactured by the method is proposed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NEXANSPARIS FRA PARIS PARIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aue, Volker Dortmund, DE 46 474
Schramm, Eduard Hannover, DE 3 17

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00