Current interruption device and electricity storage device using the current interruption device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9876259
SERIAL NO

14908729

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A current interruption device includes a deforming plate, a contact plate and a conducting plate which configure a current path. The deforming plate includes one surface on an opposite side from the contact plate facing a first space, a pressure of which is retained to a same pressure as the internal pressure of the casing and the other surface opposed to the contact plate facing a second space, a pressure of which is retained to a same pressure as an external pressure of the casing. When the internal pressure rises above the predetermined level, the second contact portion is separated from the conducting plate by deformation of the deforming plate toward the contacting plate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KABUSHIKI KAISHA TOYOTA JIDOSHOKKIAICHI AICHI
EAGLE INDUSTRY CO LTDTOKYO TOKYO METROPOLIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Akiyama, Hirokuni Kariya, JP 35 183
Akiyoshi, Norimitsu Tokyo, JP 6 14
Hirose, Takayuki Kariya, JP 93 403
Iwa, Toshiaki Tokyo, JP 37 491
Minagata, Atsushi Kariya, JP 47 199
Mitsuyasu, Makoto Tokyo, JP 6 14
Mune, Shimpei Kariya, JP 9 42
Nishihara, Hiroyasu Kariya, JP 24 103
Ogawa, Yoshihiro Tokyo, JP 208 2536
Okuda, Motoaki Kariya, JP 64 296

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00