Trench power transistor structure and manufacturing method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9876106
SERIAL NO

15189478

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A trench power transistor and a manufacturing method thereof are provided. The trench power transistor includes a substrate, an epitaxial layer, a trench gate structure, a body region, and a source region. The epitaxial layer disposed on the substrate has a trench formed therein. The trench gate structure disposed in the trench includes a bottom dielectric structure, a gate dielectric layer, and a gate. The bottom dielectric structure formed in a lower portion of the trench includes an insulating layer formed along a first inner wall of the lower portion of the trench defining a groove, and a non-conductive structure formed in the groove. The gate dielectric layer is formed along a second inner wall of an upper portion of the trench, and the gate is formed in the trench and connects the gate dielectric layer. The body region and the source region are formed in the epitaxial layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUPER GROUP SEMICONDUCTOR CO LTDHSINCHU COUNTY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hsu, Hsiu-Wen Hsinchu County, TW 47 59

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00