Semiconductor device, display device, input/output device, and electronic device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9876099
SERIAL NO

15493215

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

To suppress change in electric characteristics and improve reliability of a semiconductor device including a transistor formed using an oxide semiconductor. A semiconductor device includes a transistor including a gate electrode, a first insulating film, an oxide semiconductor film, a second insulating film, and a pair of electrodes. The gate electrode and the oxide semiconductor film overlap with each other. The oxide semiconductor film is located between the first insulating film and the second insulating film and in contact with the pair of electrodes. The first insulating film is located between the gate electrode and the oxide semiconductor film. An etching rate of a region of at least one of the first insulating film and the second insulating film is higher than 8 nm/min when etching is performed using a hydrofluoric acid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEMICONDUCTOR ENERGY LABORATORY CO LTDKANAGAWA KANAGAWA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hiraishi, Suzunosuke Tochigi, JP 35 466
Jintyou, Masami Tochigi, JP 194 2572
Koezuka, Junichi Tochigi, JP 382 6294
Obonai, Toshimitsu Tochigi, JP 48 293

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00