Method of manufacturing a device with MOS transistors

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9876032
SERIAL NO

15296205

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A device includes both low-voltage (LV) and high-voltage (HV) metal oxide semiconductor (MOS) transistors of opposite types. Gate stacks for the transistors are formed over a semiconductor layer. First spacers made of a first insulator are provided on the gate stacks of the LV and HV MOS transistors. Second spacers made of a second insulator are provided on the gate stacks of the HV MOS transistors only. The insulators are selectively removed to expose the semiconductor layer. Epitaxial growth of semiconductor material is made from the exposed semiconductor layer to form raised source-drain structures that are separated from the gate stacks by the first spacers for the LV MOS transistors and the second spacers for the HV MOS transistors.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
STMICROELECTRONICS (CROLLES 2) SAS850 RUE JEAN MONNET CROLLES 38920

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Andrieu, Francois Saint-Ismier, FR 26 97
Bidal, Gregory Grenoble, FR 8 19
Chhun, Sonarith Pontcharra, FR 13 279
Golanski, Dominique Gieres, FR 14 20
Josse, Emmanuel La Motte Servolex, FR 14 98
Mazurier, Jerome Cestas, FR 3 52
Weber, Olivier Grenoble, FR 27 136

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00