Ferroelectric capacitor, ferroelectric field effect transistor, and method used in forming an electronic component comprising conductive material and ferroelectric material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9876018
SERIAL NO

14958182

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method used in forming an electronic component comprising conductive material and ferroelectric material comprises forming a non-ferroelectric metal oxide-comprising insulator material over a substrate. A composite stack comprising at least two different composition non-ferroelectric metal oxides is formed over the substrate. The composite stack has an overall conductivity of at least 1×102 Siemens/cm. The composite stack is used to render the non-ferroelectric metal oxide-comprising insulator material to be ferroelectric. Conductive material is formed over the composite stack and the insulator material. Ferroelectric capacitors and ferroelectric field effect transistors independent of method of manufacture are also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
U S BANK NATIONAL ASSOCIATION AS COLLATERAL AGENT633 WEST FIFTH STREET 24TH FLOOR LOS ANGELES CA 90071

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chavan, Ashonita A Boise, US 46 534
Nahar, Manuj Boise, US 32 130
Ramaswamy, Durai Vishak Nirmal Boise, US 257 1597

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00