Semiconductor device and method of forming DCALGA package using semiconductor die with micro pillars

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9875988
SERIAL NO

14927361

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor device has a first semiconductor die disposed over a substrate. A plurality of composite interconnect structures are formed over the semiconductor die. The composite interconnect structures have a non-fusible conductive pillar and a fusible layer formed over the non-fusible conductive pillar. The fusible layer is reflowed to connect the first semiconductor die to a conductive layer of the substrate. The non-fusible conductive pillar does not melt during reflow eliminating a need to form a solder resist over the substrate. An encapsulant is deposited around the first semiconductor die and composite interconnect structures. The encapsulant flows between the active surface of the first semiconductor die and the substrate. A second semiconductor die is disposed over the substrate adjacent to the first semiconductor die. A heat spreader is disposed over the first semiconductor die. A portion of the encapsulant is removed to expose the heat spreader.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JPMORGAN CHASE BANK N A AS SUCCESSOR AGENT10 S DEARBORN FLOOR L2 CHICAGO IL 60603

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chinnusamy, Satyamoorthi San Jose, US 11 315
Ho, Kok Khoon San Jose, US 9 276
Pan, Andrew Shanghai, CN 3 21
Tan, Weng Hing San Jose, US 2 27

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00