Methods of forming contact holes using pillar masks and mask bridges

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9875932
SERIAL NO

15277636

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fabrication method of the semiconductor device comprises forming an isolation layer and an active region, which is defined by the isolation layer, on a substrate, forming an insulating layer on the substrate, forming a plurality of pillar masks, which are spaced from one another by a first gap and a second gap that is smaller than the first gap, on the insulating layer, forming spacers on the plurality of pillar masks, forming mask bridges in regions where the plurality of pillar masks are spaced from one another by the second gap by partially removing the spacers and forming a contact hole, which exposes the active region, by etching the insulating layer using the plurality of pillar masks and the mask bridges.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRONICS CO LTDGYEONGGI DO SOUTH KOREA GYEONGGI-DO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Nam-Gun Yongin-si, KR 37 859
Lee, Chan-Mi Suwon-si, KR 6 41

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00