Process for manufacturing a plurality of structures

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9875914
SERIAL NO

14898937

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process comprises the following steps: a) provision of a chamber suitable for receiving a plurality of structures, b) circulation of a gas stream in the chamber so that the chamber has a non-oxidizing atmosphere, c) heat treatment of the plurality of structures at a temperature above a threshold value above which the oxygen present in an oxide of a dielectric diffuses through an active layer reacts with semiconductor material of the active layer and produces a volatile material, the process being noteworthy in that the step b) is carried out so that the gas stream has a rate of circulation between the plurality of structures greater than the rate of diffusion of the volatile material into the gas stream.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOITECPARC TECHNOLOGIQUE DES FONTAINES CHEMIN DES FRANQUES BERNIN 38190

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
David, Carole Crolles, FR 8 23
Gourdel, Christophe Saint Maximin, FR 6 406
Kononchuk, Oleg Grenoble, FR 89 317
Landru, Didier Champ Pres Froges, FR 72 782
Mougel, Sebastien Saint Martin d'Heres, FR 2 0
Schneider, Xavier Le Versoud, FR 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00