Manufacturing method of metal oxide semiconductor transistor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9875901
SERIAL NO

14941648

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A manufacturing method of MOS transistor, the MOS transistor includes a substrate, a gate oxide, a gate, a source/drain region and a silicide layer. The gate oxide is disposed on the substrate and the gate is disposed on the gate oxide. The source/drain region is disposed in the substrate at two sides of the gate. The silicide layer is disposed on the source/drain region, wherein the silicide layer includes a curved bottom surface and a curved top surface, both the curved top surface and the curved bottom surface bend toward the substrate and the curved top surface is sunken from two sides thereof, two ends of the silicide layer point tips raised up over the source/drain region and the silicide layer in the middle is thicker than the silicide layer in the peripheral, thereby forming a crescent structure. The present invention further provides a manufacturing method of the MOS transistor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNITED MICROELECTRONICS CORPNO 3 LI-HSIN ROAD 2 SCIENCE-BASED INDUSTRIAL PARK HSIN-CHU CITY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chiang, Wen-Tai Tainan, TW 24 377
Lin, Chun-Hsien Tainan, TW 286 2079

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00