Multilayer ceramic electronic component and manufacturing method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9875849
APP PUB NO 20160351332A1
SERIAL NO

14990742

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multilayer ceramic electronic component includes: a main body; and a first external electrode disposed on a first surface of the main body and a second external electrode disposed on a second surface of the main body. The first external electrodes include a first base electrode forming an edge portion of the first surface of the main body and a first terminal electrode disposed on a portion of the first base electrode. The second external electrodes include a second base electrode forming an edge portion of the second surface of the main body and a second terminal electrode disposed on a portion of the second base electrode.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRO-MECHANICS CO LTDGYEONGGI DO KOREA SUWON SUWON GYEONGGI-DO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chun, Duk Hyun Suwon-si, KR 6 56
Juhng, Bong Jun Suwon-si, KR 2 33
Lee, Jin Woo Suwon-si, KR 294 2436
Lee, Won Pyo Suwon-si, KR 1 30
Park, Myung Jun Suwon-si, KR 91 619
Yoo, Seung Hee Suwon-si, KR 8 105

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00