Drawing data generation apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9875435
SERIAL NO

15220038

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A drawing data generation apparatus includes a first intermediate data generation section that generates first intermediate data from formation image data in which a formation image is indicated as a cluster of drawing components, a second intermediate data generation section that generates, from the first intermediate data, second intermediate data indicating drawing content of each line-shaped region of the formation image, and a drawing data generation section that generates, from the second intermediate data, drawing data indicating drawing content of each line-shaped region in a row of pixel data. The second intermediate data generation section selects, based on the first intermediate data, either a first scheme of arranging an overlap of the drawing components and generating the second intermediate data from the cluster of drawing components or a second scheme of expressing and integrating the drawing components as a cluster of the pixels and generating the second intermediate data.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FUJIFILM BUSINESS INNOVATION CORP7-3 AKASAKA 9-CHOME MINATO-KU TOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hara, Yuki Yokohama, JP 92 337

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00