Database view generation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9875276
APP PUB NO 20160364445A1
SERIAL NO

14739555

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In some embodiments, a system for database view generation may include a view generator configured to generate a database view for one or more database tables. The view generator includes a generation module configured to determine a generation template for the database view, where the generation template is a code structure describing a manner in which the database view is created. The code structure does not reference a database name of the one or more database tables. The generation module is configured to invoke a code composer to insert code commands into the generation template to build a structured query language (SQL) statement for the database view, where the SQL statement references the database name of the one or more database tables. The view generator is configured to create the database view based on the SQL statement.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAP SEDIETMAR-HOPP-ALLEE 16 WALLDORF 69190

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Golec, Adrian Schwetzingen, DE 4 24
Hammann, Fabian Schifferstadt, DE 3 18
Lang, Georg Ludwigshafen am Rhein, DE 29 144

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00