Method for producing structures or contours on a workpiece, and moulder

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9874864
SERIAL NO

14386422

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a molder, at least one rotatably driven tool (7, 8, 10, 11) is used to produce the structure (27) or contour on the workpiece (1) by workpiece removal. The workpiece positions along the workpiece (1) for producing the structure or contour are set depending on the data of the workpiece (1) and of the tool (7, 8, 10, 11). The data are transmitted to the machine controller which processes the CNC program based on the data during the passage of the workpiece (1) through the molder and moves the tool (7, 8, 10, 11) into the required positions via CNC drives depending on the workpiece position. The workpiece position is sensed during the passage of the workpiece (1) through the molder. In order to sense the workpiece position in the molder, at least one measuring element (18) is provided upstream and downstream of the tool (1), said measuring element (18) being connected to the machine controller and supplying signals that describe the advancing travel of the workpiece (1) to the machine controller. By way of the machine controller, the tool (7, 8, 10, 11) is moved into the respective tool positions in accordance with the signals.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MICHAEL WEINIG AGWEINIGSTRASSE 2/4 97941 TAUBERBISCHOFSHEIM 97941

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Konrad, Andreas Lauda-Königshofen, DE 12 48
Schmidt, Jürgen Werbach, DE 32 125

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00