Optical film including protrusions, display device including the same and method of manufacturing optical film

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9874666
APP PUB NO 20150043221A1
SERIAL NO

14323379

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An optical film, a display device including the same, and a method of manufacturing the optical film, the film including a first refractive index layer including a plurality of protrusions; a second refractive index layer covering the plurality of protrusions, the second refractive index layer having a refractive index that is different from a refractive index of the first refractive index layer; and a support layer on the first refractive index layer or the second refractive index layer, wherein a ratio of a height to a width of the protrusion is 0.5 or more.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG DISPLAY CO LTD1 SAMSUNG-RO GIHEUNG-GU YONGIN-SI GYEONGGI-DO 17113 17113
SEKONIX CO LTD28 PYEONGHWA-RO 2862 BEON-GIL DONGDUCHEON-SI GYEONGGI-DO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baik, Nam Seok Yongin, KR 6 46
Lee, Chan Hee Yongin, KR 26 93
Lee, Duk Jin Yongin, KR 20 49
Lee, Gyeong-Im Yongin, KR 5 38
Ma, Jang Seok Yongin, KR 6 59
Seo, Jung Chul Yongin, KR 3 34
Son, Jung Hee Yongin, KR 6 40
Yoon, Seok Il Yongin, KR 9 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00