Dark current correction in scintillator detectors for downhole nuclear applications

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9874653
SERIAL NO

15679784

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A radiation logging tool is provided that includes a scintillator detector for use on a wellbore tool string to characterize earth formations. The scintillator detector has a shutter to allow for the collection of data differentiating between incident radiation, such as backscatter signal, and system noise, such as dark current, vibration noise, electronics thermal noise, and electrostatic noise. The radiation logging tool provides for a method of calibrating and measuring incident radiation by the removal of system noise. The shutter is positioned between the photosensor and scintillation member of the scintillator detector, and is able to switch between open and closed states while the scintillation detector is deployed. Measurements of signal noise can be used to calibrate the sampling signal of incident radiation on the scintillator detector.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HALLIBURTON ENERGY SERVICES INC3000 N SAM HOUSTON PARKWAY E HOUSTON TX 77032-3219

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Vehra, Imran Sharif Kingwood, US 20 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00