Humidity control apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9874365
SERIAL NO

14345119

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In the present invention, liquid absorbent is cooled or heated during off-peak hours of electricity demand to prevent the margin between electricity supply and demand from being tightened. A humidity control apparatus switches an absorbent circuit between a regenerated position in which a regeneration circuit is formed, and a humidity-controlled position in which a humidity control circuit is formed. In the regeneration circuit, during a period during which humidity control operation is stopped, outlet and inlet ends of a regeneration passage communicate with each other, and liquid absorbent circulates within the regeneration passage. In the humidity control circuit, during the humidity control operation, a humidity control passage and the regeneration passage communicate with each other, and liquid absorbent circulates between the humidity control passage and the regeneration passage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DAIKIN INDUSTRIES LTDOSAKA CITY OSAKA OF JAPAN OSAKA-SHI OSAKA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujita, Naotoshi Sakai, JP 18 39
Ikegami, Shuji Sakai, JP 41 355

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00