Cogenerating system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9874114
SERIAL NO

14791066

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cogenerating system includes a Rankine cycle, a high-temperature heat transfer medium circuit, a low-temperature heat transfer medium circuit, a bypass channel, a heat exchanger, and a flow rate adjustment mechanism. The high-temperature heat transfer medium circuit is configured such that an evaporator is supplied with a high-temperature heat transfer medium by a high-temperature heat transfer medium heat exchanger. The low-temperature heat transfer medium circuit is configured such that a condenser is supplied with a low-temperature heat transfer medium by a low-temperature heat transfer medium heat exchanger. The flow rate adjustment mechanism includes at least a flow rate limiter that limits the flow rate of the high-temperature heat transfer medium to be supplied to the evaporator, and adjusts a ratio of the flow rate of the high-temperature heat transfer medium flowing through the bypass channel to the flow rate of the high-temperature heat transfer medium flowing through the evaporator.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTDOSAKA JAPAN OSAKA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hikichi, Takumi Osaka, JP 51 215
Kido, Osao Kyoto, JP 37 297
Okaichi, Atsuo Osaka, JP 68 264

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00