Method for preparing oxysulphide and fluorinated derivatives by sulphination

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9873666
APP PUB NO 20160221939A1
SERIAL NO

15021419

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention concerns a method for preparing an oxysulphide and fluorinated derivative, said method comprising the reacting, in the presence of an organic solvent, of: i) at least one compound of formula Ea-COOR (I), in which Ea represents the fluorine atom or a group having 1 to 10 carbon atoms chosen from fluoroalkyls, perfluoroalkyls and fluoroalkenyls and R represents hydrogen, a monovalent cation or an alkyl group, and ii) a sulphur oxide, said method being such that the initial molar ratio (sulphur oxide/compound of formula (I)) is less than 0.4 and the concentration of sulphur oxide dissolved in the reaction medium is kept constant for the entire duration of the reaction to a value of between 0.2% and 3% by weight by means of continually adding said sulphur oxide to the reaction medium.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RHODIA OPÉRATIONS5 RUE DE CLICHY PARIS 75009

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chauve, Marie Lyons, FR 2 1
Dambrin, Valery Saint Genis-laval, FR 5 0
Metz, François Irigny, FR 12 7
Revelant, Denis Genas, FR 23 116

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00