Vehicle floor portion structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9873462
SERIAL NO

15278810

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There is provided a vehicle floor portion structure having: a floor panel; a tunnel portion that projects-out toward a vehicle upper side at a vehicle transverse direction central portion of the floor panel; a cross member that is bridged, along a vehicle transverse direction, between the tunnel portion and a rocker that is at a vehicle transverse direction outer side of the floor panel; a bracket that is disposed so as to be apart from the cross member in a vehicle longitudinal direction, and whose bottom portion is fixed to the floor panel, and whose side portion is fixed to a side wall portion of the tunnel portion or the rocker, and a seat is fixed to the bracket; and a reinforcement that is provided at an upper portion of the tunnel portion or the rocker, and to which an upper portion of the bracket is joined.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Onishi, Yoichiro Nisshin, JP 5 39

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00