Vehicle skeleton structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9873457
SERIAL NO

15078118

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vehicle skeleton structure including: a tunnel portion that projects upward in a vertical direction at a vehicle width direction central portion of a floor panel, and that extends in a vehicle front-rear direction, the tunnel portion including side wall portions opposing each other in the vehicle width direction, and an upper wall portion that interconnects upper end portions of the side wall portions; a tunnel upper reinforcement member that covers the upper wall portion and the side wall portions of the tunnel portion from an exterior of each and that is joined to the tunnel portion; and a cross member that bridges, along the vehicle width direction, the tunnel portion and a rocker that is disposed at a vehicle width direction outer side of the floor panel, and that extends in the vehicle front-rear direction, the cross member being directly or indirectly joined to the tunnel upper reinforcement member.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Onishi, Yoichiro Nisshin, JP 5 39

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00