Method and system for starting a motor vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9873337
APP PUB NO 20150336460A1
SERIAL NO

14409694

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a method for starting a motor vehicle having a first vehicle electrical system, to which a battery of the motor vehicle is assigned, a second vehicle electrical system, to which an electric machine of the motor vehicle is assigned, and a DC/DC converter for connecting the two vehicle electrical systems, for starting, electrical energy from the second vehicle electrical system is converted via the DC/DC converter and transferred into the first vehicle electrical system if an actual value of at least one operating parameter of the battery falls below a setpoint value prior to a starting operation to be carried out.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROBERT BOSCH GMBHSTUTTGART GERMANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Geiger, Albert Eberdingen, DE 26 560
Harport, Stefan Mainhardt, DE 1 1
Karacay, Turgut Weil der Stadt, DE 2 8
Keil, Oliver Winterstein, DE 32 228
Motz, Juergen Steinheim an der Murr, DE 18 46
Post, Amalinda Christina Ludwigsburg, DE 1 1
Raeumschuessel, Stefan Ditzingen, DE 1 1
Schoch, Eberhard Stuttgart-Feuerbach, DE 18 420
Stoller, Felix Stuttgart, DE 1 1
Walenta, Sebastian Stuttgart, DE 3 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00