Process for the production of a carbon supported catalyst

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9873107
SERIAL NO

15126801

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for the production of a carbon supported catalyst, which comprises the following steps:

    (a) precipitation of at least one metal oxide onto a surface of a carbon-comprising support by preparing an initial mixture, comprising the carbon-comprising support, at least one metal oxide precursor and an organic solvent, and spray-drying of the initial mixture to obtain an intermediate product,(b) loading of noble-metal-comprising particles onto the surface of the intermediate product in a liquid medium by deposition, precipitation and/or reduction of a noble-metal-comprising precursor with a reducing agent,(c) heat treatment of the catalyst precursor resulting from step (b) at a temperature higher than 400° C.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BASF CATALYSTS GERMANY GMBHSELIGMANNALLEE 1 HANNOVER 30173

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Becker, Nicole Böhl-Iggelheim, DE 1 5
Hass, Andreas Mannheim, DE 2 7
Schwab, Ekkehard Neustadt, DE 137 949
Weber, Franz Eppelheim, DE 42 437

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00