Honeycomb structure and manufacturing method of honeycomb structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9873071
SERIAL NO

14618253

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The honeycomb structure includes a honeycomb structure part having porous partition walls, and porous plugged portions, and when there is drawn a straight line as an inner boundary line which is positioned at a distance of 30% of a distance between an outer end surface and an inner end surface, from the inner end surface, and there is drawn a straight line as an outer boundary line which is positioned at a distance of 70% of the distance between the outer end surface and the inner end surface, from the inner end surface, each of the plugged portions has an outer region, and an inner region which is the region between the inner end surface and the inner boundary line and whose porosity is larger than a porosity of the outer region.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NGK INSULATORS LTD2-56 SUDA-CHO MIZUHO-KU NAGOYA-SHI AICHI-PREFECTURE 467-8530

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Suenobu, Hiroyuki Nagoya, JP 32 355
Tsuchiya, Yusuke Nagoya, JP 18 97

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 23, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 23, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00