Method for making a circuit board

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9872393
SERIAL NO

14886581

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A circuit board includes a core layer, at least one passive component, a first and a second conductive wire layers, at least one contact pad, and a resin packing layer. The core layer defines at least one through hole to receive the passive component. The first and the second conductive wire layers are connected to two opposite surfaces of the core layer. Each contact pad is positioned between and connected to one passive component and the first conductive wire layer. The resin packing layer is filled among the core layer, each passive component, each contact pad, the first and the second conductive wire layers. The resin packing layer can connect the first and the second conductive wire layers to the core layer, and connect the core layer, each passive component, and each contact pads to each other.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AVARY HOLDING (SHENZHEN) CO LIMITED27TH FLOOR BLOCK A AVARY TIME CENTER NO 2038 HAIXIU ROAD HAIBIN COMMUNITY XIN AN STREET SHENZHEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yeh, Tzu-Chien New Taipei, TW 5 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00