Contention based uplink transmissions for latency reduction

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9872313
SERIAL NO

14856374

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Contention-based uplink communications within a wireless communications system are provided in which a user equipment (UE) may transmit data to a base station autonomously, and thereby reduce delay with established procedures for allocating uplink resources to a UE. A base station may allocate contention-based uplink resources from a set of available uplink resources. A UE may determine that data is to be transmitted using contention-based uplink resources, identify available contention-based resources allocated by the base station, and may autonomously transmit the data using the allocated contention-based resources. The contention-based uplink resources may include a subset of available physical uplink shared channel (PUSCH) resources. The contention-based PUSCH resources may include allocated bins, and a UE may select CB-PUSCH resources from one of the bins for transmission of the uplink data.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
QUALCOMM INCORPORATED5775 MOREHOUSE DRIVE SAN DIEGO CA 92121-1714

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dabeer, Onkar Jayant San Diego, US 28 468
Damnjanovic, Aleksandar Del Mar, US 801 16611
Damnjanovic, Jelena Del Mar, US 636 4081
Malladi, Durga Prasad San Diego, US 595 21006
Ozturk, Ozcan San Diego, US 634 2437
Vajapeyam, Madhavan Srinivasan San Diego, US 194 4299
Wei, Yongbin La Jolla, US 636 15790
Xu, Hao San Diego, US 1643 22960

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00