Method, base station, and terminal for notifying and receiving downlink demodulation pilot frequency control signaling

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9872311
APP PUB NO 20150341958A1
SERIAL NO

14648922

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for notifying a downlink demodulation pilot control signaling, includes: a base station side notifying a user equipment (UE) side of an index of a virtual signaling group and/or index of port offset signaling group used when generating a downlink pilot sequence and/or mapping the generated downlink pilot sequence through at least one of the following information: UE-specific or common high layer signaling; antenna indication information of DL_Grant; new data indication information in a Disable TB signaling in the DL_Grant; scrambling indication information in the DL_Grant; in a UE-specific or common search space, an aggregation level of the DL_Grant, a relative position of a first control channel element of the DL_Grant in the UE-specific or common search space, a subframe number where the DL_Grant is located and a system frame number where the DL_Grant is located.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ZTE CORPORATION518057 DEPARTMENT OF LAW ZHONGXING BUILDING SOUTH HI TECH INDUSTRIAL PARK NANSHAN DISTRICT HI TECH INDUSTRIAL PARK GUANGDONG SHENZHEN SHENZHEN CITY GUANGDONG PROVINCE 518057

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Dongli Shenzhen, CN 26 303
Guo, Senbao Shenzhen, CN 68 848
Sun, Yunfeng Shenzhen, CN 76 1002
Zhang, Junfeng Shenzhen, CN 212 1466
Zhang, Wenfeng Shenzhen, CN 120 1779

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00