TDD uplink/downlink configuration enhancements

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9872287
SERIAL NO

15035731

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to the performing, by a mobile station, of a PUSCH transmission (3) in response to a DCI transmission (1). Specifically, in case a first TDD uplink/downlink configuration, according to which the communication is configured, is different from a second TDD uplink/downlink configuration, on the basis of which the DCI to PUSCH timing relations are defined (2a), and in case these DCI to PUSCH timing relations define plural timing relations for performing PUSCH transmissions in response to a single DCI transmission (2b), the mobile station applies a pre-stored association (2c) indicating a single timing relation that is to be used for determining the PUSCH transmission based on the subframe in which the corresponding DCI transmission is received (2d).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PANASONIC INTELLECTUAL PROPERTY CORPORATION OF AMERICA2050 W 190TH STREET SUITE 450 TORRANCE CA 90504

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Einhaus, Michael Darmstadt, DE 84 1124
Golitschek, Edler von Elbwart Alexander Darmstadt, DE 403 4076

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00