Interconnecting system, video signal transmitter and video signal receiver for transmitting an N-symbol data signal

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9871988
SERIAL NO

14980073

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present application relates to an interconnect system for transmitting a stream of N-symbol data signals, which comprises a parallel data signal line bus, a line scrambler, a line de-scrambler and a defect detector. The defect detector is configured to detect one or more defective data signal lines. The line scrambler 110 is configured to accept an N-symbol data signal d having a sequence of data symbols in a predefined order and to output a permuted sequence d′ of data symbols at its N output terminals oj. The line de-scrambler is configured to accept the permuted sequence d′ of data symbols at its input terminal i′j, to restore the predefined order of the data symbols from the permuted sequence d′ of data symbols; and to output the restored N-symbol data signal d comprising a sequence of data symbols in the predefined order.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NXP USA INC6501 WILLIAM CANNON DRIVE WEST AUSTIN TX 78735

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aubineau, Vincent Areches, FR 28 62
Geffrotin, Didier Christian Clichy, FR 5 4
McAslan, Steve Bruce Glasgow, GB 1 2
Staudenmaier, Michael Andreas Munich, DE 46 157

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00