Portlet scheduling with improved loading time and loading efficiency

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9871845
SERIAL NO

14721285

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A data processing, and more specifically, to a method and system for portlet scheduling. The method for scheduling a plurality of portlets according to the present invention comprising: obtaining invocation time of the plurality of portlets; obtaining weights of the plurality of portlets; assembling the plurality of portlets into a plurality of threads according to the invocation time and the weights, wherein the assembled plurality of threads has similar thread invocation time. With the method and system for scheduling a plurality of portlets according to illustrative embodiments, the plurality of portlets are assembled into a plurality of threads having similar thread invocation time according to invocation time and importance of each portlet, and the above problems are better solved, thus loading time of the portlets can be significantly reduced, loading efficiency of the portlets can be improved, thereby better improving user experience.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTERNATIONAL BUSINESS MACHINES CORPORATIONNEW ORCHARD ROAD ARMONK NY 10504

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ye, Meng Beijing, CN 34 449
Zhou, Xiao Si Beijing, CN 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00