Method and apparatus for transmitting control channel in intra-cell carrier aggregation system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9871637
APP PUB NO 20170085353A1
SERIAL NO

15369567

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure relates to a method and an apparatus for transmitting a control channel in an intra-cell carrier aggregation system. The method includes establishing a connection with a base station through a Primary cell (Pcell) of a Time Division Duplex (TDD) scheme and a Secondary cell (Scell) of a Frequency Division Duplex (FDD) scheme. The method also includes receiving data through the Scell before a timing configured as an uplink sub-frame according to a TDD UpLink-DownLink (UL-DL) configuration of the Pcell. The method also includes transmitting a feedback of the received data through the Pcell in a feedback sub-frame. By the method, a feedback for a data can be effectively transferred.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRONICS CO LTDGYEONGGI DO SOUTH KOREA GYEONGGI-DO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cho, Joonyoung Gyeonggi-do, KR 270 3143
Choi, Seunghoon Gyeonggi-do, KR 380 3229
Ji, Hyoungju Seoul, KR 349 2989
Kim, Youngbum Seoul, KR 408 3966

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00