Phase continuity in narrow-band transmission within a frequency-domain multiple-access communication system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9871607
SERIAL NO

15220406

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for communication includes, in a transmitter, generating a signal for transmission to a receiver over a frequency sub-band assigned within a predefined system bandwidth, using a selected transmitter carrier frequency. The signal is converted into a phase-compensated signal by applying to the signal, using a phase compensator in the transmitter, a phase compensation that compensates for phase discontinuities caused to the signal due to a frequency difference between the transmitter carrier frequency and a center frequency, which is used by the receiver for down-converting the predefined system bandwidth. The phase compensation depends on the frequency difference. The phase-compensated signal is transmitted to the receiver over the frequency sub-band, using a transmitter front-end module.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MARVELL ASIA PTE LTDSINGAPORE CITY SINGAPORE CITY SINGAPORE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Melzer, Ezer Tel Aviv, IL 41 883
Moshavi, Shimon Bet Shemesh, IL 51 881
Perets, Yona Raanana, IL 63 750

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00