Semiconductor device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9871525
SERIAL NO

15449285

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to one embodiment, in a semiconductor device, a connection block includes multiple unit configurations, in each of which a first line extends along a first direction. A second line is placed above the first line and extends along a second direction which intersects with the first direction. A first variable resistance element has one end electrically connected to the first line and another end electrically connected to the second line. The third line is placed above the second line and extends along the first direction. A second variable resistance element has One end electrically connected to the second line and another end electrically connected to the third line. A fourth line is placed above the third line. The fourth line extends along the second direction. A third variable resistance element has one end electrically connected to the third line and another end electrically connected to the fourth line.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KABUSHIKI KAISHA TOSHIBAKANAGAWA KANAGAWA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yamada, Yutaka Fuchu Tokyo, JP 164 2452

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00