Power conversion device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9871482
SERIAL NO

15310143

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power conversion device includes a high-pass filter for extracting an AC component of voltage Vdc of a DC link section, a multiplier for multiplying output VdcAC of the high-pass filter by a first gain K1 and outputting the result, a multiplier for multiplying output of the multiplier by a second gain K2 and outputting the result as a d-axis voltage correction signal vdcmp*, and a multiplier for multiplying output of the multiplier by a third gain K3 and outputting the result as a q-axis voltage correction signal vqcmp*. The gate signal generation section generates gate signals on the basis of a signal vd1 obtained by adding the d-axis voltage correction signal vdcmp* to a d-axis voltage command value vd* and a signal vq1 obtained by adding the q-axis voltage correction signal vqcmp* to a q-axis voltage command value vq*.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATION7-3 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO 100-8310

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ishikawa, Shuta Chiyoda-ku, JP 13 51
Kato, Masanori Chiyoda-ku, JP 157 1153
Marumoto, Shotaro Chiyoda-ku, JP 1 3
Nishimura, Shunichi Chiyoda-ku, JP 4 56
Takezawa, Ryuichi Chiyoda-ku, JP 9 30

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00