Power supply control apparatus, vehicle and method of controlling power supply

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9871480
SERIAL NO

15226235

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

If a total power consumption of the high- and low-voltage auxiliary machinery is greater than a first reference value when the high-voltage secondary battery is disconnected from the high-voltage wiring by the relay, the power supply control apparatus sets a lower value to a target control value of the generator output voltage, compared with the total power consumption is less than or equal to the first reference value. If the total power consumption of the high- and low-voltage auxiliary machinery is less than a second reference value that is less than or equal to the first reference value when the high-voltage secondary battery is disconnected from the high-voltage wiring by the relay, the power supply control apparatus sets a higher value to the target control value of the generator output voltage, compared with the total power consumption is more than or equal to the second reference value.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Toyora, Sachio Gotemba, JP 20 62

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00