Reserve power system transfer switches for data center

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9871406
SERIAL NO

14133525

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for performing computing operations in a data center includes one or more sets of computer systems, one or more primary power systems, and a reserve power system. The primary power systems include a downstream portion that supplies power to at least one of the sets of computer systems. The reserve power system includes switches that switch between supplying a primary power feed and a reserve power feed from the reserve power system through part of the primary power system. An input resiliency switch can switch between supplying primary power or reserve power to support power supplied to the sets of computer systems through the primary power system based upon a primary power feed fault. A power distribution switch can switch between supplying primary power and reserve power to part of the downstream portion of the primary power system to bypass an upstream portion of the primary power system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AMAZON TECHNOLOGIES INCPO BOX 81226 SEATTLE WA 98108-1226

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Churnock, Paul Andrew Vashon, US 10 115
Hughes, Patrick Enfield, IE 40 749
McGee, Nigel Ashburn, US 5 93
Nguyen, Huyen Van Bothell, US 11 142
Wildstone, Kelsey Michelle Seattle, US 9 81

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00