Modular switchgear connection and method of electrically connecting a modular compartment to a switchgear assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9871331
APP PUB NO 20150357774A1
SERIAL NO

14763552

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A modular switchgear electrical connection for use with a modular compartment includes a branch busbar having a busbar aperture defined by the branch busbar. Also included is a connection arrangement for establishing an electrical connection with the branch busbar. The connection arrangement includes a fastener extending through the busbar aperture toward the modular compartment. The connection arrangement also includes a spout including a base wall and a cavity defined by at least one wall extending from the base wall, wherein the base wall includes a spout aperture for receiving the fastener. The connection arrangement further includes a contact component including a base portion a cylindrical portion extending from the base portion, the contact component defining an aperture for receiving the fastener, the contact component secured to the spout and the fastener with a nut for engaging the fastener.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ABB SCHWEIZ AGBRUGGERSTRASSE 66 BADEN 5400

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ren, Xuhui Shanghai, CN 10 66

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00